AnsweredAssumed Answered

why does task scheduler print "1 of 1" at the bottom of every drawing?

Question asked by Chris Scougall on Jan 16, 2019

I'using SW 2018 and the task scheduler adds "1 of 1" at the bottom of a of the drawings when doing a batch plot. is there a way to remove this?

Outcomes