AnsweredAssumed Answered

Link BOM to drawing view

Question asked by Bryan Obermeyer on Oct 31, 2018
Latest reply on Oct 31, 2018 by Bryan Obermeyer

I have an assembly with many configuration. I create a drawing (3 standard views and an ISO) with a BOM (created from the ISO).

To create a new drawing I do a "save as" and change the parent view configuration to the new config. The BOM on the new drawing does NOT change, I have to change it manually.

Can the BOM be linked to the new drawing configuration so that the BOM updates automatically? Is there a switch that I'm missing.

Outcomes