We are currently running drop test studies. 1 Analysis will
take at least 170 hours to complete. We had power failures in the
night longer than our UPS can handle.
Is there any way that we can save or capture the run process so that we can start the anlysis from there if the power fails again.
Is there any way that we can save or capture the run process so that we can start the anlysis from there if the power fails again.