I currently have an assembly of a cabinet face frame parts. I have created them via use of the weldments profile tool.
Is there a way I can take these pieces and organize them on a stock material size in such a way as to give me the most efficient use of material?
This would be used on a cut list sheet so that the operator would know they would be able to get parts A, B, and C off of stock material D.
Make sense?
Thanks for the help, and input.
This is a very good question. I want to see what others do to minimize material waste, especially with a weldment.
In the past at home when I make something from something like plywood, I'd create a separate assembly and lay the pieces out on the plywood, spaced the kerf width of my saw blade apart and try to minimize effort and wasted wood.
However, at work we don't actually make the parts here. So, I haven't explored this area too much.