6 Replies Latest reply on Mar 1, 2018 9:50 AM by Iain McEwen

    CHANGE REVISION LEVEL BACK TO PREVIOUS ONE IN EPDM

    Tommy Kowalczyk

      Does anyone know how to drop a Revision Level back to a previous revision, using EPDM?  I have a drawing that I am working on and after making a few changes, it bumped the Rev up a level.  The original drawing was a REV "A".  After making the changes, it should now be a REV "B".  However, after making a few changes, it bumped it to a REV "C".  Trying to correct it,.. it bumped it to a REV "D" now.

       

      There has to be a way to get it back to the original revision.  I know that all depends on how I have the vault configured as well as the tasks, but I am stumped.

       

      Any ideas on  a workaround??