AnsweredAssumed Answered

CHANGE REVISION LEVEL BACK TO PREVIOUS ONE IN EPDM

Question asked by Tommy Kowalczyk on Feb 28, 2018
Latest reply on Mar 1, 2018 by Iain McEwen

Does anyone know how to drop a Revision Level back to a previous revision, using EPDM?  I have a drawing that I am working on and after making a few changes, it bumped the Rev up a level.  The original drawing was a REV "A".  After making the changes, it should now be a REV "B".  However, after making a few changes, it bumped it to a REV "C".  Trying to correct it,.. it bumped it to a REV "D" now.

 

There has to be a way to get it back to the original revision.  I know that all depends on how I have the vault configured as well as the tasks, but I am stumped.

 

Any ideas on  a workaround??

Outcomes