I am trying to get costing going for Machining and I ran in to an issue. While the setup times in the template for Machine "Operation Setup Time(min)", show minutes, it looks like it's calculating in seconds. When I put in 00:30:00 per setup, I get 90 seconds added for the 3 operations I have. Does anyone else have this issue?
I just answered my own question. My lot size was 60, and the quote shows the setup time "per part", not per lot or per total quantity, so it was dividing by 60 and looked like seconds. Oops!