Hi All,

 

In an assembly of a hydraulic cylinder assembly, there are two sketches (1250 and 800) which drives the assembly. Which mate do I use so that the hole moves/slides freely only between the two dots (and also the moving/sliding distance updates itself as we change the sketch dimensions). I have tried doing mates with minimum and maximum values, but it is not working. I want the mate to be dependent on the dots and not a maximum or minimum value. Thanks in advance.

 

Regards,

 

LS