AnsweredAssumed Answered

how can i set up a time for sheet metal operations in costing?

Question asked by Krzysztof Pluta on Nov 17, 2017
Latest reply on Jun 6, 2019 by Valerie Sonnenberg

Hello Everyone,

 

I am trying to configure a costing template for sheet metal but i can`t find where to define time for specific operations. In machining template there is a column "Time per Cut Length".

When i open other template (for a sheet metal) there are diferent columns.

is there an option to calculate a time for sheet metal features? the icon "show Time" is greyed.

Outcomes