0 Replies Latest reply on Aug 16, 2017 5:53 PM by Carter West

    Follow the bouncing ball

    Carter West

      Attached is a simplified zip version of the assembly I'm trying to create.  NDA prohibits uploading entire assembly. 2017-08-16_14-36-03.png

      I need to load a series of tubes onto the track rod (mount is to be developed).  The track rod is a tapered helix.  At any given moment, I need 30 instances of tubes to be 'staring' dead center to the orb (sphere, ball, etc).  The spacing between the tubes should be equal.  The lead in and lead out of the tube can be oriented in any direction.  The contest is to make the tube axis to always be looking at the center of the ball.

      Many thanks in advance

      Carter