AnsweredAssumed Answered

GD&T Question

Question asked by Christopher Estelow on Jul 12, 2017
Latest reply on Jul 17, 2017 by Christopher Estelow

I am working on creating a drawing from an old government drawing and I've come across a question. One of the dimensions of a diameter has this geometric tolerance on it:

 

 

Should this be changed over to Total runout like this:

 

(I know that datum B is not shown but I have it on the diameter)

 

This is how it is called out on the drawing now:

 

Any thoughts?

 

Chris

Outcomes