AnsweredAssumed Answered

solidworks costing bounding box is wrong

Question asked by Justin Reule on Jun 15, 2017

I'm trying to use solidworks costing. The bounding box that costing is using is not the same as the cut list or the sheet mental. Is there a way to fix the costing bounding box?

Outcomes