    Can I Change Revision without altering the "Latest Revision no" variable

    Robert Pickeral

      I've created a drawing rework cycle counter. But I discovered it's using but it's changing the system variable "Latest Revision no". We use that variable (on a data card) to check to see that the Drawing revision on a (potentially old) drawing titleblock is different that the system Revision variable.

      QUESTIONS:

      Is there a way to get a rework cycle counter working without altering the "Latest Revision no" variable?  OR

      Is there a better way to check to see if the Drawing Revision (on the data card and Drawing is the same as the PDM system variable?

       

      Thank you.