Hi Guys. I want to now when we gives mate relatives between two parts wich ones of them move to other. Former or latest, Can we define?
Hi Guys. I want to now when we gives mate relatives between two parts wich ones of them move to other. Former or latest, Can we define?
Hi Mesut. The first part you place in an assembly is fixed in position by default. All subsequent parts can either be placed on the origin which will fix them, or you can place them elsewhere in the window area and they will be floating, at which point you can add your mates. Using this workflow, the latest part moves in relation to the first. If you decide you want to change this, you can right click and 'float' a fixed part. You would then want to right click 'fix', or fully define another part within the assembly, most likely to the assembly planes.
It would be nice if you could present us with a screen shot or a file of what you are trying to do.........Depends if one part is fixed or not...
In SolidWorks you need to define one, "If" you want stable designs... You can leave both of them floating, but I would suggest that you do everything the same and that is the first part that goes into an assembly feature tree is either fixed to the point of origin or mated to where it can't move....
I have found what ı mean. At the assambley if ı drag whicever ı select from two float parts to other while press ALT its okey.