AnsweredAssumed Answered

Drawing Revision

Question asked by Emil Tietje on Oct 21, 2008
Latest reply on Oct 22, 2008 by 1-YJ1IM
We are using PDMWorks with life cycle enabled and revision set:

Preliminary 01,02,03, etc

Released -,A,B, etc.

We have this working. The problem is check in going to rev - to rev A. We using the following steps:

The drawing is checked as a working copy.

The the drawing is revision and checkin. The the starus is changed from working to Released. This adds the rev note and new revision

Part of our drawing procedure is to add rev marks in the changed locations. The only way we know how to this is change the drawing to working, add the rev mark, and check it back in as the original rev. This is time consuming and prone to errors.

Is there a method to add the rev marks and approved during the initial rev check in.

Thanks

Outcomes