AnsweredAssumed Answered

what is HMIN in solidworks motion Analysis

Question asked by Prasad Bhave on Nov 26, 2016

EVENT BASED MOTION got following note for motion analysis:

STFINT:MIN_STEP_SIZE  HMIN=1.000000000E-07; Reached At Time=3.203673418E-03. 

  The integrator could not advance the simulation.

  An attempt to further decrease the integration step-size failed. 

  Suggested course of action:

  1. Decrease the value of HMIN.

  2. Relax the accuracy requirements (ERROR) on the integrator.

  3. Increase the number of iterations allowed for convergence.

  4. Revisit the way the mechanical system has been modeled.

  Last good step-size: 1.164988982E-07.

please let me under stand meaning of above massage

 


  The dynamic solver is being restarted with the modified corrector.

Outcomes