AnsweredAssumed Answered

Macro To link all views to BOM on Sheet 1

Question asked by Cad Admin on Nov 4, 2016
Latest reply on Jul 29, 2019 by Whit Elliott

Anyone have a macro to link all drawing views back to a BOM that has been replaced on sheet 1.  My guys like to swap out BOM, but sometime they don't re-link the BOM after they load a new one.  I have some assemblies that are 5-12 sheets long and can be as many as 30-40 views.  Manually linking them is very tedious.

Outcomes