    i machine

    Gabor Klivenyi

      Hi,

      we have three questions concerning SolidCAM 2015x64 (SP2 HF5) iMachining.

      1. Target and Machined Stock Compare Options. Do you have good experience about it? Our experience is that does not show the correct information.
      2. According to simulation the work process was 7 hours but in the reality it was ~1 hour.
      3. Technology Rough Step Down. After the changing the tool diameter the Rough Step Down is overwritten by iMachining. The value is not understandable (eg.:this valu is not the 1/2 of the diameter, rather random value?). Each tool diameter changed is controlled by iMachining and overwritten by it.

       

      Thanks:

      Arnold Palko