Hi,
we have three questions concerning SolidCAM 2015x64 (SP2 HF5) iMachining.
- Target and Machined Stock Compare Options. Do you have good experience about it? Our experience is that does not show the correct information.
- According to simulation the work process was 7 hours but in the reality it was ~1 hour.
- Technology Rough Step Down. After the changing the tool diameter the Rough Step Down is overwritten by iMachining. The value is not understandable (eg.:this valu is not the 1/2 of the diameter, rather random value?). Each tool diameter changed is controlled by iMachining and overwritten by it.
Thanks:
Arnold Palko