I want to know what to, in order to reverse some revisions.
Somebody in my office has the configuraton of the revisons wrong,
because anytime he saves a drawing automatically his revison
increased to the point that he is at the maximum of the revisions,
since we do changes to some drawings that do not require a
revision. what can we do to reverse this? or how to handle in a
better way the revisions?
thanks
thanks
I will do that to see what happens