Preview | SOLIDWORKS USER FORUM
Use your SOLIDWORKS ID or 3DEXPERIENCE ID to log in.
MBMac Baker29/05/2008
I've drawn a multi floor factory and hope to place 20 pieces
of equipment avg 10 meg in size each and include some equipment and
routed piping runs.
We are required / held to purchase from Dell and have budgeted to purchase a dream machine provided that Dell can build it.
-Mac
We are required / held to purchase from Dell and have budgeted to purchase a dream machine provided that Dell can build it.
-Mac