Joost Vanhoof

updating revision table when replacing drawing

Discussion created by Joost Vanhoof on Apr 9, 2008
Hi,

I have a drawing in the vault with a revision table with some revisions.
I received a drawing from a supplier, and a want to put it in the vault with the same name, but as a new revision.

How can I put it in the vault, with the older revisions being showed in the (new) rev table?

Outcomes