AnsweredAssumed Answered

2008 top down and pdmwe

Question asked by Adrian Ivanescu on Feb 14, 2008
Latest reply on Feb 22, 2008 by Adrian Ivanescu
If I'm working with a top-down concept inside an assembly I cannot use a model with a serial number created from the administration tool because PDMWE doesn't intercept the "Insert new part" event.
What does it mean ? Is the PDMWE the end of top down projects ?

Outcomes