If I'm working with a top-down concept inside an assembly I
cannot use a model with a serial number created from the
administration tool because PDMWE doesn't intercept the "Insert new
part" event.
What does it mean ? Is the PDMWE the end of top down projects ?
What does it mean ? Is the PDMWE the end of top down projects ?