Hi everbody

We're a small fork lift truck manufacturer, and are currently using SW2007 SP4 to design truck attachments. We're also trying to use SW to desgin our lift trucks. We have a HP LH 3000, P3 800mhz server and cannot design anything with more than 100 sub-assemblies in a top assembly. We will have something like 500 sub-assemblies and 2000 parts in a complete vehicle assembly. We hope we will be solving our problems by upgrading our server. We have a 150 GB drawing database into the same server as well as 5 SW licences operating at the same time. What should we look for replacing our existing server?
Any help would be appreciated.

Thanks

Regards
Edward