Preview | SOLIDWORKS USER FORUM
Use your SOLIDWORKS ID or 3DEXPERIENCE ID to log in.
DEDavid Edwards06/12/2007
My company is looking at the pros and cons of including a
revision column to assembly drawings to reflect the subcomponent
revision. On typical projects we have 4-5 levels in our top-level
assembly. We are starting to get into using more components on
multiple projects. Top-level system revisions aren't a concern to
them nor is revising every assembly drawing between subcomponent to
top-level drawings.
I'm looking for input as to the pro's and con's of such a system. What type of impact, other than time (because time isn't important o.O), could this type of change make? By what other means could revision information be transfered to vendors (that make assemblies) to show them exactly what has changed?
Thanks
I'm looking for input as to the pro's and con's of such a system. What type of impact, other than time (because time isn't important o.O), could this type of change make? By what other means could revision information be transfered to vendors (that make assemblies) to show them exactly what has changed?
Thanks