2 Replies Latest reply on Nov 19, 2007 2:22 PM by Jeff Sweeney

    How to switch Workflow

    Rene Daanen
      Hi All, I have a part, which is in the default workflow (RevisionManaged).
      What I want, is to change the Revision Controlled SW-part to aNon-Revision-Managed part (Standard part).

      Is this possible?
      I think I have to switch workflow.
      Is this true?
      How can I do this?
      Or is there another (more easy) way?
      Thanks in advance, Rene Daanen Holland