AnsweredAssumed Answered

Revision table error?

Question asked by 1-5MPX2J on Sep 21, 2007
Latest reply on Jan 10, 2008 by 1-5MPX2J
Hi All,

I'm trying to setup our revision scheme, where we have three statuses, Draft, Tooling and Released like this:

00AA
2'nd A is Draft
1'st A is Tooling
00 is Released.

So the sequence would look like this: 00AA, 00AB, 00AC -> 00B, 00C, 00D -> 01, 02 and so forth.

So I want it to loose a letter for each status change. This works fine between Draft and Tooling, but going to Released, I get a Vault 201 error. See attached picture.

What am I missing here?

Attachments

Outcomes