Hi

I am new to PDMworks and I am trying to work my way through it soforgive me if I am asking simple questions.
Am I correct in assuming that when I start a project, I create theparts,drawings and assemblies on say my local drive and then Icheck them into the Vault once completed or can I check the partsin before I finish my drawings or assemblies??
At the moment I am building a large assembly but I am issuingdrawings for production before the Main assembly is completed,do I check this Assembly in or do I leave on my local drive untilit is completed?
If I check in a solidworks drawing, will this check in parts aswell?

I am trying to go through the help files but advice from the forumwould be greatly appreciated
cheers D