Question asked by luke dearth on Jul 9, 2008
Latest reply on Jul 11, 2008 by 1-A5CHD1
We currently have legacy drawings that need to be submitted to PDM Works Enterprise. If possible, we would like to keep the existing revision level in the title block (rev. C). Is it possible to keep our current revision level and then continue to inc. that rev. level as needed in the future? Any help would be appreciated.

Thanks,

Luke