AnsweredAssumed Answered

Revision variable update in drawing sheet

Question asked by David Serrell on Sep 3, 2013
Latest reply on Sep 4, 2013 by Arto Kvick

I would like to be able to get my Revision variable to update my drawing sheet.  I have had succes with other variables such as Description, Part Number, etc. by using the $PRPSHEET command in the variable menu.  However, this does not seem to work with the Revision variable.  It does not update with the data card variable.

 

Has anyone been able to do this?

Outcomes