I'm trying to start with a piping conection and end with a tubing connection. I managed to get what I wanted but with mixed results. Some times I had to use tubing flanges, sometimes I had to use piping flanges, the problem I was having was when I wanted a tubing route it would sometimes come out as a piping route. Is there a definative way to get one or the other?
Start your route using Flexible Tubing and Piping commands. I dont know exactly where they are located on the ribbon but they can be found under
Routing=>Piping=>Start by Drag/Drop
Routing=>Flexible Tubing=>Start by Drag/Drop
then drag and drop parts from routing library