Ken Brown

Goal Setting

Discussion created by Ken Brown on Jun 12, 2009
Latest reply on Jul 27, 2009 by Joe Galliera
I have design analysis that requires me to measure the volume flow through 70 different channels. Does it make more sense to set all of these as goals before the run or measure them after the run? I am concerned that 70 goals could put my solve time through the roof or that somehow measuring afterwards won't be as accurate. Does anyone have experience with this and which direction they found more satisfactory?

Thanks,
Ken